SP Power Cable EW1-

North Buona Vista (Permanent Shaft) &

Ayer Rajah (Permanent Shaft)

Project:
SP Cable EW1
Client:
Singapore Power
Main Contractor:
Obayashi Corporation
Contract Duration:
Jul 2013 (On going)

Description:

Construction of 2 East West Transmission Cable tunnel, include Drilling for blasting, Rock Bolt and Shotcreting and Permanent Lining Works in the Shafts, Adit and Enlargements for the Project, at Ayer Rajah Shaft, North Buona Vista Shaft and Holland Shaft
PROJECT PAGE FILL hor

Jurong Rock Cavern Project

( 2 shafts dia 24m, Depth 132m)

Project:
Jurong Rock Cavern
Client:
Jurong Town Corporation
Main Contractor:
Sato Kogyo (S) Pte Ltd
Contract Duration:
Jul 2007 to Jun 2009

Description:

Construction of two 24.0 m diameter shafts to a depth of 132m using explosive and non-explosive methods.

PROJECT PAGE FILL

LTA MRT Circle Line C902

Pipe Roof & NATM Tunnel Project

Project:
Downtown line 1 C902 @ Promenade Station
Client:
Land Transport Authority
Main Contractor:
Shanghai Tunnel Engineering Co. Ltd
Contract Duration:
Jul 2010 to Nov 2011

Description:

Installation of Pipe Roof and construction of 2 NATM Tunnels.

PROJECT PAGE FILL

LTA MRT Downtown Line2

C915-Cut & Cover Station project

Project:
Downtown line 2 C915 @ Hillview Station
Client:
Land Transport Authority
Main Contractor:
SK E&C Co. Ltd
Contract Duration:
Nov 2011 to Oct 2014

Description:

Construction of cut & cover station box permanent works of tunnels between Station @ Beauty World and Hillview.

PROJECT PAGE FILL

LTA MRT Downdown Line

C918-Cross Passage & Sump Pit Project

Project:
Downtown line 2 C918A @ Tan Kah Kee Station
Client:
Land Transport Authority
Main Contractor:
SK E&C Co. Ltd
Contract Duration:
Jan 2014 to Sep 2014

Description:

Construction of 34m long Cross passage and 2 pump sumps include both temporary and permanent works.

PROJECT PAGE FILL

LTA Thomson Line Advance Work

T2123-NATM Tunnel & Pile removal

Project

Project:
Thomson Line Advance work T2123
Client:
Land Transport Authority
Main Contractor:
Presscrete Engineering Pte Ltd
Contract Duration:
Nov 2014 (On Going)

Description:

Construction of 142m long NATM tunnel, removed piles and I beams. Complete and finish with LSS back filling.

PROJECT PAGE FILL

PUB Deep Tunnel Sewerage System T0-1

Project:
PUB-DTSS T0-1
Client:
Public Utilities Board
main Contractor:
Woh Hup, Shanghai Tunnel EC JV
Contract Duration:
Apr 2000 to Apr 2005

Description:

Construction of Work Shaft and NATM tunnel. Concrete Permanent Lining Construction

PROJECT PAGE FILL